Liffey A Technical Spec
THE LIFFEY A
(Exhibition Tenancy)
​
​
OVERVIEW
For specific technical requirements, notice of 10 working days must be given in advance for any additional technical equipment and services. Please include your preferred location and quantity of the equipment listed below and we will be pleased to offer a quotation.
DIMENSIONS AND SEATING
The hall is flat floored, 626.34 sqm with carpeted Latex felt floor.
• Ceiling height is 7 metres to underneath of trussing.
• Net Stand Area is 340.6 sqm
ACCESS
​
Level loading access to this room is via 2 x goods lifts to the Northwest Corner of the building with a flat push to the room. Lift Door dimensions are 3.9m wide x 3.2 m high & 2.9m wide x 3.2 m high
STAGE
​
Staging can be provided at an additional cost.
​
SUSPENSION
​
The Truss layout in the ceiling provides 1-tonne suspension points every 3m in a square pattern over the entire hall. These suspension points are available by quotation. Rigging proposals require prior approval by the Technical Department.
​
5. LIGHTING
House lighting: Discharge lighting for general use.
Larger Lighting rigs for are available by quotation. A Standard Package Ceiling Wash is available.
6. POWER
13-amp sockets are available in the walls up to a maximum overall load of 32amps.
Additional power available by quotation.
PLEASE NOTE THE ABOVE EQUIPMENT SPECIFICATION MAY BE SUBJECT TO CHANGE.
7. STAFFING
The technical staff included for a standard Exhibition is:
One Exhibition Manager for build-up and breakdown
CCD Technical Staff work a 9-hour shift, including one hour for lunch between the hours of 07:00 – 21:00. Additional hours or times outside of 0700 – 2100 are charged per technician per hour. All CCD technical staff are permitted to work a maximum 12-hour day. Technical personnel must have 11 hours off-site between the end of one day and the start of the following. Please bear this in mind when planning crew call times.
To ensure that The CCD can meet your requirements, all staff and equipment requests that are outside of your package must be confirmed in writing 10 working days prior to the start of tenancy.